Lagoon of Venice: creation of the forecasting and modeling centre
Thetis participated in the creation and management of the forecasting and modelling Center dedicated to the study and monitoring of meteorological,…
Monitoring of Venice Lagoon: the MODUS project
Design and execution of monitoring activities for the classification of the chemical and ecological status of water bodies of the Venice lagoon…
River basin management plan for the Eastern Alps
The Management Plan of the River Basins of the Eastern Alps (Italy) represents the operational tool, established within the European Water Framework…
Modeling analysis about the effects of the activation of Mose on the lagoon trophic level
In 2018, the Venezia Nuova Consortium entrusted Thetis with the task of supporting the operation and management of the Arsenale Control Room as part…
Lagoon of Venice: morphological and environmental recovery interventions
Thetis is involved in the design of numerous environmental morphological recovery interventions both in the lagoon and coastal marine areas.
Lagoon of Venice: Master Plan for adaptation to climate change
Thetis developed the Master Plan of adaptation measures for the sustainable management of the Venetian lagoon system in the context of climate change
Environmental impact study for Off-shore terminal
Thetis has developed the documentation to support the environmental authorization process of the preliminary design of the multimodal offshore…
Restoration and recovery of Natura 2000 sites
Thetis, collaborated, as a partner of the “Consorzio Venezia Nuova”, for the construction supervisor of several projects described in the Plan of…
Intlet of Lido Malamocco and Chioggia intlet. Automation and Control System. System of Anti-intrusion and video surveillance
Thetis, as a partner of the Consorzio Venezia Nuova (CVN) concessionaire, collaborated for the design and construction supervision of the works…
Pellestrina shoreline. Nourishment restoration intervention
Thetis, collaborated, as a partner of the “Consorzio Venezia Nuova” concessionaire, collaborated for the design and construction supervision of the…
Construction, management and maintenance of the “Mose System” in the northern area of the Venetian Arsenal
Thetis collaborated for the design and construction supervision of the intervention concerning the infrastructure of Tesa 112 which is part of the…
Recovery of the San Felice Fort in Chioggia
Thetis collaborated for the design and construction supervision of the works in relation to the recovery of the San Felice Fort in Chioggia.
Projects Archive
Morphological, environmental and hydrodynamic redevelopment restoration in the Northern Lagoon
Thetis collaborated for the design and construction supervisor of the activities concerning the continuation of the morphological restoration of the intertidal surfaces. The intertidal surfaces considered are located in the Northern sector of the lagoon and reached by the Cenesa channel and its branches, Siletto channel and Lanzoni channel, which sorround the Lanzoni valley and which once conveyed the Sile and Piave waters.
Protection of Piazza San Marco from High water
Thetis has collaborated for the design and supervision of the works for the protection to the Insula of St.Mark’s Square from high water.
Recovery of the Northern Arsenal Area of Venice
Thetis, since its foundation, has carried out the design and works supervision of the recovery of the Northern Area of the Arsenal, from planning to the projects necessary for the establishment of new activities.